|
Systems Architects and Engineers specialising in the effective use of Systems Architecture, Methods and Tools since 1982 |
|
|
Shown during stage 4. The source and target projects (two test projects) have been chosen and the material to be transferred has been selected. The current stage shows the schema changes which will be required in the target project to accommodate the data from the source. Watch the wizard's spell grow as you go through the stages.
Click the Exit button to return to the main menu. |